Substation Pre-Start Checklist

Form Template

The Electric Substation Pre-Start Checklist is a mobile app that allows inspectors to conduct a pre-start assessment using an iPhone, iPad, Android device, or the Windows desktop.

5,000 Companies save time and money with GoCanvas

Lumen Logo Post Consumer Brands Logo Saluda Hill Landscapes Logo Te3co Logo Two Men and a Truck Logo VIP Lighting Logo

The checklist should be completed by the electrical contractor or control room operator and sent to the client within 7 days of the scheduled start-up.

All relevant check parameters are covered, including transformers, key interlocks, housekeeping pads, cables, breakers, start-up schedules, risk assessment, machine safety, and more. It would also be beneficial to list all electrical equipment used as part of an overall safety checklist and security analysis.

The information collected is always accessible on the GoCanvas Cloud and can be printed as a PDF so it can be sent to any other electrical contractor during the scheduled start-up phase.

Features
  • Signature Capture
  • Submission Editing
  • Reference Data
  • Dispatch
Read More
Platforms
  • iPhone
  • iPad
  • Android
  • Windows
Read More
Integrations
  • Quickbooks
  • Salesforce
  • Google Docs
  • Dropbox
Read More
*The Capterra SoftwareAdvice ​and GetApp logos are a service mark of Gartner, Inc. and/or its affiliates and is used herein with permission.*

Don't take our word for it...

“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”

Dave Kramer, PennLine Service

Connect with one of our experts today.

We’ll help you put together the right solution for your needs.

Contact Us