Medium

Available on

Apple Android Windows

Water and Sewage: Construction Plans Checklist Mobile App

Use this mobile app to quickly verify if the water and sewer plans adhere to the county and state standards. This app can be used for residential, commercial, institutional and industrial subdivisions. App lays out an extensive checklist that designers can use on any smartphone. The checks range from correct pipe locations, pipe sizes, to manhole numbers and their location etc. Add detailed notes, capture signature for instant validation. Make this app your own by modifying the fields or checklist items to suit your business needs. Using this checklist will help prevent any design issues that may have been ignored, eliminates paper, expedites the application process, and saves time and money!

  • Lendlease
  • The Cooperative
  • PG&E
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Water and Sewage: Construction Plans Checklist Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico textbox

    Project Name

  • Ico textbox

    Designer

  • Ico textbox

    Checked By

  • Ico signature

    Signature

  • Ico date

    Date

  • Ico dropdown

    Site plan with water layout only (topographic overlay required).

  • Ico dropdown

    Pipe locations and sizes (8" minimum for water mains).

  • Ico dropdown

    Materials to be used.

  • Ico dropdown

    Location and size of gate valves at intersections, along water mains, at fire hydrants, and at co...

  • Ico dropdown

    Thrust blocks at all bends and tees

  • Ico dropdown

    Location of all existing and proposed fire hydrants.

  • Ico dropdown

    Existing water mains locations, sizes, and types of material surrounding the project.

  • Ico dropdown

    Detail of connection to existing water main.

  • Ico dropdown

    Nearest existing line valves on both sides of connection to existing water main.

  • Ico dropdown

    Proposed meter sizes and locations.

  • Ico dropdown

    Water mains on north and east side of road.

  • Ico dropdown

    If proposed water line crosses private property, a 20 foot permanent easement must be provided.

  • Ico statictext

    Details

  • Ico dropdown

    Fire hydrant at end of line in cul-de-sacs

  • Ico dropdown

    Air & Vacuum release valve assembly

  • Ico dropdown

    Line valve

  • Ico dropdown

    Typical fire hydrant installation

  • Ico dropdown

    Location of air release valves.

  • Ico dropdown

    A gate valve and a minimum of 36 feet of pipe shall be provided at the end of all lines for phase...

  • Ico dropdown

    Detail dead end line with one full joint of D.

  • Ico dropdown

    Flow test required for each phase.

  • Ico decimal

    Current Cost

  • Ico dropdown

    EPD Sanitary Sewer Extension Submittal Form filled out for proposed project.

  • ...and More!

Related Construction, Repair & Improvement Apps... and they're all free for GoCanvas subscribers!

App Name

Storm Drain Pollution Prevention

Water in storm drains often flow directly to local creeks and other bodies of water without treatment. Storm water poll...

App Name

Sanitation Prerequisite Program: Che...

The Sanitation Prerequisite Program: Chemical Storage Map mobile app ensures that stored chemicals are kept away from foo...

App Name

UNICEF Sanitation Handbook: Preparing...

The UNICEF Sanitation Handbook: Preparing the Annual Work Plan Mobile App provides an example of the detailed levels of an...

App Name

Sewer Repairs and Cleanout Installation

Use the Sewer Repairs and Cleanout Installation mobile app on your smartphone for sewer installation and repair guidelines...

App Name

Field Sanitation Checklist

The Field Sanitation Checklist is designed to ensure safe and sanitary working conditions in the field. This app was devel...

App Name

Drain Pipe Installation - Exterior Ti...

The Drain Pipe Installation - Exterior Time and Material Form is an invoice template app (also exports as a pdf doc) which...

App Name

Development of Sanitation Program: Be...

Most bacteria are not a concern for the beverage industry. This is because raw materials, processing techniques and the fi...

App Name

Development of Sanitation Program: Sa...

A sanitation program is an important prerequisite program. Effective prerequisite programs form the foundation of any HACC...

More Information


Related Blog Posts