Concrete Structures Inspection: Finishing Concrete: Class I and II Finish Mobile App

A Class I finish is required as the minimum for all formed and unformed surfaces. A Class II finish is required for formed surfaces that are normally visible to the public. If a pleasing appearance has not been achieved, either in the formed surface or at the joints, the Engineer will order that the surface be finished with a Class II finish. See the Savings Possible with GoCanvas!

  • Lendlease
  • The Cooperative
  • PG&E
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Concrete Structures Inspection: Finishing Concrete: Class I and II Finish Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico statictext

    The primary purposes of finishing formed surfaces are to:

  • Ico checkbox

    seal the surface from water and other elements that can rust or corrode metal ties and reinforcem...

  • Ico checkbox

    provide a uniform, pleasing appearance for surfaces that will remain visible to the public.

  • Ico statictext

    A Class I finish is required as the minimum for all formed and unformed surfaces.

  • Ico checkbox

    all metal ties are clipped or removed, including:

  • Ico checkbox

    complete removal of tie rods, and

  • Ico checkbox

    clipping or breaking off snap ties or tie wires so that the remaining portion is recessed to at l...

  • Ico checkbox

    all recesses, holes, honeycombed spots, and other irregular areas that could provide openings int...

  • Ico checkbox

    cleaned to sound concrete,

  • Ico checkbox

    moistened with water, and

  • Ico checkbox

    patched with mortar (consisting of 1 part cement, 2 parts sand, water, and an approved adhesive);...

  • Ico checkbox

    curing compound is applied, if the forms were removed for finishing before the full curing period...

  • Ico statictext

    A Class II finish is required for formed surfaces that are normally visible to the public.

  • Ico checkbox

    rubbing shall continue until irregularities are removed and there is no excess material;

  • Ico checkbox

    at the time a light dust appears, the surface shall be brushed or sacked in one direction to prod...

  • Ico checkbox

    the surface is uniformly rubbed with:

  • Ico checkbox

    cork, wood, or rubber floats,

  • Ico checkbox

    polystyrene, or

  • Ico checkbox

    a mechanical carborundum stone:

  • Ico checkbox

    any mortar used to facilitate rubbing:

  • Ico checkbox

    is used in small enough amounts to produce a lather without plaster-coating the surface, and

  • Ico checkbox

    matches the color of the surrounding concrete;

  • Ico checkbox

    the surface is brushed or sacked uniformly in one direction until a light dust appears; and

  • Ico checkbox

    if the surface is finished before the full curing period has passed:

  • Ico checkbox

    other exposed surfaces are kept covered with a moisture-tight covering except during actual finis...

  • Ico checkbox

    curing compound is applied after the finishing work is completed.

  • ...and More!

Related Construction, Repair & Improvement Apps... and they're all free for GoCanvas subscribers!

App Name

Concrete Paving Quality Control Proce...

The Concrete Paving Quality Control Procedures: Suggested Testing Equipment by Suite Level mobile app is provided as a gui...

App Name

Concrete Pavement Rehabilitation: Dri...

The Concrete Pavement Rehabilitation: Drill and Grout Reinforcement Bars mobile app is has been designed to be used as spe...

App Name

Portland Cement Concrete: Repair of D...

Pavements damaged by rain and deficiencies caused by poor workmanship may be repaired or restored to an acceptable conditi...

App Name

Concrete Structures Inspection: Fixed...

The fixed-form, cast-in-place method can be used for just about any incidental concrete structure. Its basic requirements ...

App Name

Hot Bituminous Paving Checklist

The Hot Bituminous Paving Checklist mobile app can be completed using a smartphone or tablet. The app covers: Examining Pl...

App Name

Concrete Structures Inspection: Concr...

The hardening of concrete must be properly cured to control cracking, shrinkage and warpage. Ensure that all concrete is c...

App Name

Concrete Pavement Rehabilitation: Ful...

The Concrete Pavement Rehabilitation: Full Depth Repair Type SA-CD mobile app has been designed to be used as specificatio...

App Name

Caltrans Hot Mix Asphalt (QCQA): Hot...

The contractor is responsible for inspecting the production, transportation, placement, and compaction of hot mix asphalt ...

More Information