Medium

Available on

Apple Android Windows

Quick Check List for the Reclaimed Water Connection Mobile App

In accordance with the reclaimed water ordinances, reclaimed water connections must pass a cross connection inspection prior to the activation of reclaimed water service. As a public service and as required, County Utilities will conduct a Cross Connection Inspection before you connect to the reclaimed water system. Please remember that reclaimed water is for the irrigation of exterior landscaping, trees, lawns and most gardens. Reclaimed water lines are not allowed inside of any building. Prior to beginning any work, please use the Quick Check List for the Reclaimed Water Connection mobile app and contact your local municipality and your local building department to determine if a permit is required.

  • Lendlease
  • The Cooperative
  • PG&E
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Quick Check List for the Reclaimed Water Connection Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico date

    Date

  • Ico multiline

    Location of Connection

  • Ico textbox

    Company

  • Ico textbox

    Contact

  • Ico textbox

    Person Connecting Reclaimed Water

  • Ico signature

    Signature

  • Ico checkbox

    using or any combination thereof.

  • Ico checkbox

    In- Ground Irrigation System:

  • Ico checkbox

    In-Ground Hose Bibb:

  • Ico checkbox

    Above Ground Hose Bibb:

  • Ico checkbox

    Home Owner must complete and sign the application.

  • Ico checkbox

    3. Return the application to County Utilities via email or by mail:

  • Ico checkbox

    Once the Reclaimed Water Application has been received and processed, you will receive confirmat...

  • Ico checkbox

    For a successful inspection of your irrigation system, please be certain that the system is comp...

  • Ico checkbox

    Finally when the irrigation system is complete and ready for your Reclaimed Water Cross Connecti...

  • Ico textbox

    “Please Call” for Reclaimed Water Inspection (Phone Number)

  • Ico multiline

    Please Review:

  • Ico multiline

    Remarks

  • Ico checkbox

    Irrigation system - A complete and operable irrigation system.

  • Ico checkbox

    Master Control Valve (required) - This is an in-line valve used to turn off the water if repairs...

  • Ico checkbox

    Paint - paint must be UV resistant and equivalent to Krylon's "Safety Plum Purple".

  • Ico checkbox

    Irrigation Valve Box (optional) - Standard box with a lid that is either purple in color from th...

  • Ico multiline

    Remarks

  • Ico checkbox

    No connection to the reclaimed water system shall be made until the County Inspector is present.

  • Ico checkbox

    All irrigation systems connected to the reclaimed water system shall have a master control valve...

  • Ico checkbox

    At the point of connection to the reclaimed water pipe and disconnection from the existing pipe(...

  • Ico checkbox

    All irrigation systems connected to reclaimed water shall have a wye strainer installed.

  • Ico checkbox

    If you choose to use an irrigation valve box, it must have a lid that is either purple in color ...

  • ...and More!

Related Inspections & Surveys Apps... and they're all free for GoCanvas subscribers!

App Name

Potable Water Truck Inspection

Inspectors, water haulers and water companies supplying potable water will want to use the Potable Water Truck Inspection ...

App Name

Recycled Water Service Plan: Site-Spe...

The Recycled Water Service Plan: Site-Specific Retrofit Requirements mobile app intended as part of with a Recycled Water ...

App Name

Recycled Water Service Plan: Construc...

The Recycled Water Service Plan: Construction Water Release Form mobile app intended as part of with a Recycled Water Prog...

App Name

Checklist for Drinking Water Source A...

Public water systems can use the Checklist for Drinking Water Source Assessment Spring Data Sheet mobile app with a smartp...

App Name

Possible Contaminating Activities (PC...

Public water systems can use the Possible Contaminating Activities (PCA) Inventory Other Activities mobile app with a smar...

App Name

Incident Action Checklist to Respond ...

Drought is a period of abnormally dry and/or unusually hot weather that is sufficiently prolonged to cause a serious hydra...

App Name

Recycled Water Service Plan: Cross-Co...

The Recycled Water Service Plan: Cross-Connection Control Testing and Procedure mobile app intended as part of with a Rec...

App Name

Utilities Conveyance Checklist

Use the Utilities Conveyance Checklist mobile app with a smartphone or tablet for potable water, non-potable irrigation wa...

More Information


Recent Blog Posts