Mechanical Lifting Rigging Protocol: Personnel Platform Pre-use Checklist for Use with Cranes Mobile App

The Mechanical Lifting Rigging Protocol: Personnel Platform Pre-use Checklist for Use with Cranes mobile app defines requirements for the safe use of mechanical lifting equipment and requirements for personnel responsible for safe lifting and rigging operations. This protocol applies to all operated equipment, facilities and all employees. Contractors may have their own program that meets or exceeds mechanical lifting and rigging protocol. The app covers personnel platform pre-use checklist for use with cranes and includes steps and descriptions,

  • Lendlease
  • The Cooperative
  • PG&E
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Mechanical Lifting Rigging Protocol: Personnel Platform Pre-use Checklist for Use with Cranes Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico date

    Inspection Date:

  • Ico textbox

    Mechanical Lifting Company:

  • Ico textbox

    Equipment Location:

  • Ico textbox

    Equipment Type:

  • Ico textbox

    Number:

  • Ico textbox

    Mfg.

  • Ico textbox

    S/N:

  • Ico checkbox

    Conduct a proof test with a load of 125 percent of the rated capacity for five minutes before l...

  • Ico checkbox

    Conduct a trial lift with the personnel platform unoccupied and loaded to the anticipated lift ...

  • Ico checkbox

    Conduct a visual inspection after each trial lift or proof test.

  • Ico checkbox

    Conduct a pre-lift meeting with the crane operator, employees to be lifted, person responsible ...

  • Ico statictext

    Please sign after all tests and inspections are complete:

  • Ico signature

    Crane Operator

  • Ico signature

    Person in Charge

  • Ico signature

    Signal Person

  • Ico signature

    Employees to be Lifted

  • Ico multiline

    Corrective Actions Taken:

  • Ico multiline

    Comments:

  • Ico textbox

    Rigger:

  • Ico signature

    Signature of Rigger:

  • Ico textbox

    Lift Supervisor:

  • Ico signature

    Signature of Lift Supervisor:

  • ...and More!

Related Construction, Repair & Improvement Apps... and they're all free for GoCanvas subscribers!

App Name

Roller Load Chain Inspection Report

Roller load chain inspection criteria for frequent and periodic inspections are provided in the app. These criteria shoul...

App Name

Rigging Procedure Checklist

As part of a rigging inspection crane riggers and operators should use the Rigging Procedure Checklist mobile app to compl...

App Name

Lifting and Hoisting Safety: Design, ...

The intent of the Lifting and Hoisting Safety: Design, Test, Certification and Inspection Matrix mobile app is to bring ab...

App Name

Mechanical Lifting Rigging Protocol:...

The Mechanical Lifting Rigging Protocol: Critical Lifts mobile app defines requirements for the safe use of mechanical lif...

App Name

Mechanical Lifting Rigging Protocol:...

The Mechanical Lifting Rigging Protocol: Powered Industrial Forklifts mobile app defines requirements for the safe use of...

App Name

Mechanical Lifting Rigging Protocol:...

The Mechanical Lifting Rigging Protocol: Mobile Cranes Inspection Form mobile app defines requirements for the safe use of...

App Name

Mechanical Lifting Rigging Protocol:...

The Mechanical Lifting Rigging Protocol: Trackhoe Inspection mobile app defines requirements for the safe use of mechanica...

App Name

Mechanical Lifting Rigging Protocol:...

The Mechanical Lifting Rigging Protocol: Critical Lift Worksheet mobile app defines requirements for the safe use of mecha...

More Information