Four Post Lift: Operation Instructions Mobile App

Core features are free forever

When done with installation be sure to return documents to package and give all materials to lift owner/operator. When installation is complete be sure to run lift up and down a few cycles with and without “typical” vehicle loaded on lift.Only authorized personnel are to operate lift. Read Operating and safety procedures Manual completely before operating lift. Pay attention to the lowering speed of all four corners. Make sure they are moving down at the same speed. Stop lowering the lift by releasing the lowering lever on the power unit and moving the lock lever to the lock position if any corner stops moving or is slower in descent. Always lock the lift before going under the vehicle. Never allow anyone to go under the lift when raising or lowering.

Industry: Transportation & Warehousing Service Stations

  • Apple
    iPhone, iPad
  • Android
    Android
  • Window
    Windows

Why Customers Love GoCanvas

Animation 6 b3c72478
Reduces paperwork
Tracks jobs & expenses
Shows real-time data
Affordable plans
How It Works
I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.

Dave Kramer

PennLine Service

Want to see how GoCanvas can help your business?

Request Demo

Join Thousands of Businesses Saving Time with GoCanvas