Demolition Plan Checklist (Hong Kong) Mobile App

Each project has its unique features and conditions. Demolition Plan shall be customized to meet the conditions of the individual project. One of the purposes of the Demolition Plan is to provide instructions and guidelines for the on site personnel to follow so that the works can be performed safely and effectively.

  • Lendlease
  • The Cooperative
  • PG&E
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Demolition Plan Checklist (Hong Kong) Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico statictext

    All the information and data collected during the pre-demolition survey shall be used as input fo...

  • Ico statictext

    A scaled plan showing the following information:

  • Ico checkbox

    The scale of the plan shall be in according to B(A)R13.

  • Ico checkbox

    Location of the project building with respect to lot boundary, adjacent footpath and traffic way.

  • Ico checkbox

    Location and relative heights of existing utilities, adjoining buildings and properties and their...

  • Ico checkbox

    The plan shall be fully dimensioned with elevations shown.

  • Ico statictext

    The Plan showing the project building and site conditions shall include the following:

  • Ico checkbox

    An assessment on the conditions of the building, site and adjacent properties including their his...

  • Ico checkbox

    Any features that need protection and may induce hazard during the demolition program such as env...

  • Ico checkbox

    Proposed arrangement for the removal/disposal of hazardous materials and/or chemical wastes if th...

  • Ico statictext

    A structural plan shall include the following:

  • Ico checkbox

    The overall height of the building, the ceiling height of the floors, dimensions and depth of the...

  • Ico checkbox

    Structural plans and sections, details and layouts of the structural supports and the constructio...

  • Ico checkbox

    Structural evaluation of the adjacent buildings and shared features such as party wall, staircase...

  • Ico checkbox

    Information on any special structures that require special attention, such as cantilevered struct...

  • Ico statictext

    The Plan showing the proposed method used to demolish the structure shall include the following:

  • Ico checkbox

    Descriptions of the equipment to be used.

  • Ico checkbox

    Specific guidelines on the limitations of the machine’s operation such as travel area, specific d...

  • Ico checkbox

    The sequence and proposed procedures for the demolition.

  • Ico checkbox

    Detail instructions for demolishing special features and critical areas that may impact on the ge...

  • Ico checkbox

    Specific precautionary steps for identifying these features.

  • Ico statictext

    Specification, and construction details for precautionary measures which are essential to the pro...

  • Ico checkbox

    Covered walkways, catch platforms and hoardings.

  • Ico checkbox

    Scaffolding and catchfans.

  • Ico checkbox

    Temporary supporting systems to support machines working on the building floors.

  • Ico checkbox

    Temporary supports for cantilevered structures and for bracing weakened structural elements.

  • Ico checkbox

    Detailed design for temporary support and protection of any structure that may be affected by the...

  • Ico checkbox

    Inspection and maintenance frequency for the precautionary measures.

  • ...and More!

Related Construction, Repair & Improvement Apps... and they're all free for GoCanvas subscribers!

App Name

Demolition Inspection Checklist - Sub...

Demolition is classified as high risk construction work. This Demolition Inspection Checklist - Subepack mobile app is mea...

App Name

Demolition Checklist: Before Demoliti...

This pre-demolition checklist has been converted into a mobile app for your convenience. Items covered include site locat...

App Name

Guidelines On Design of Noise Barrier...

The points in this checklist should be considered when the Contractor's design is checked. Items include Effectiveness, St...

App Name

Demolition Plan Checklist (Malaysia)

Complete this Demolition Plan Checklist (Malaysia) app to help determine the method for the demolition project. The demol...

App Name

Job Description Heavy Equipment Operator

The Job Description Heavy Equipment Operator mobile app is a detailed job description that covers: Purpose of Position, Sc...

App Name

Hydraulic Excavator Operator: Travel ...

The Hydraulic Excavator Operator: Travel with Hydraulic Excavator mobile app is designed to prepare machine for travel by ...

App Name

Hydraulic Excavator Operator: Perform...

The Hydraulic Excavator Operator: Perform Minor Maintenance and Adjustments mobile app is designed to perform minor mainte...

App Name

Procedures for Proper Disposal of Lig...

Used lamps containing mercury are regulated waste, monitored by the EPA. Non Broken mercury containing lamps are a univer...

More Information


Related Blog Posts