Checklist from Environmental Guidelines for Major Construction Sites (Australia) Mobile App

When planning construction activities for a proposed project, the environmental impact should be taken into consideration. While the construction industry has become more accustomed to compliance requirements, there is still progress to be made.

The Checklist from Environmental Guidelines for Major Construction Sites (Australia) mobile app summarizes the specific environmental issues that need to be addressed on Australian construction sites. The manager can check off each issue as it relates to the site.

The issues are listed in the same order as they appear in the Guidelines. The app includes: Compliance with legislative requirements, pre-construction planning, environmental assessment, risk assessment information, assessing and managing risks, pre-construction works, environmental management plan, environmental management system, prepare plan, land disturbance, erosion, stormwater management, erosion and sediment control devices, de-watering work site, dust control, stockpiles and batters, working in waterways and floodplains, noise and vibration (sound level), waste minimization, contaminated material and soil, hazardous waste, emergency procedures, air quality, litter, storage of chemicals and fuel, road cleaning, concrete batching plants and inspections, monitoring, audits and other topics pertaining to safety and the environment.

Use the Checklist from Environmental Guidelines for Major Construction Sites (Australia) mobile app to evaluate your construction site projects and identify areas of improvement. Upon submission, the Checklist from Environmental Guidelines for Major Construction Sites (Australia) mobile app generates a PDF that is automatically saved to the GoCanvas Cloud. Though this app is specifically designed for Australia, it can be easily modified for other areas also.

  • Lendlease
  • The Cooperative
  • PG&E
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Checklist from Environmental Guidelines for Major Construction Sites (Australia) Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico checkbox

    Collect copies of all relevant legislation, regulations and government policy.

  • Ico checkbox

    Ensure management is aware of requirements and implements due diligence systems to ensure complia...

  • Ico checkbox

    plan.

  • Ico checkbox

    Assess all possible impacts that the project will have on the environment.

  • Ico checkbox

    Determine whether construction activities will intersect a contaminated site or old tip.

  • Ico checkbox

    Assess the impact of the development on the amenity of adjacent residents.

  • Ico checkbox

    Commence monitoring all segments of the environment to determine background conditions.

  • Ico checkbox

    Collect all relevant information on the site and adjacent areas that may be affected by the devel...

  • Ico checkbox

    Collect relevant weather and climate information.

  • Ico checkbox

    Obtain design plans, work schedules and work programs that may contribute to environmental risk.

  • Ico checkbox

    Obtain a map of the site topography and generate maps of changes in topography as a result of th...

  • Ico checkbox

    Calculate stormwater flows in each micro- catchment for each phase of the development.

  • Ico checkbox

    Map changes of vegetative cover and the position of stockpiles and batters as a function of time.

  • Ico checkbox

    Collect information on stream flows of any natural waterways affected by the development.

  • Ico checkbox

    Identify all hazards to the environment.

  • Ico checkbox

    Quantify hazards, wherever possible.

  • Ico checkbox

    Determine the consequences of each hazard.

  • Ico checkbox

    Calculate the total risk level for each hazard.

  • Ico checkbox

    Rank risks.

  • Ico checkbox

    Identify all significant risks.

  • Ico checkbox

    Develop an action plan to address all significant risks.

  • Ico checkbox

    program and schedule.

  • Ico checkbox

    and environmental management plans.

  • Ico checkbox

    controls prior to project commencement.

  • Ico checkbox

    project.

  • Ico checkbox

    Ensure that all staff are adequately trained.

  • Ico checkbox

    Ensure that all procedures are written down.

  • Ico checkbox

    management system.

  • ...and More!

Related Construction, Repair & Improvement Apps... and they're all free for GoCanvas subscribers!

App Name

Soil Erosion and Sediment Control Eng...

The Soil Erosion and Sediment Control Engineering Guidelines (Australia) mobile app advises engineers on the effects of so...

App Name

Environmental Performance: Design & C...

The Environmental Performance: Design & Construct Audit Checklist (Australia) mobile app was designed to assist with g...

App Name

Sustainable Home Checklist: Bathroom ...

Sustainable homes have three fundamental components: Environmental Sustainability, Social Sustainability / Universal Desig...

App Name

Sustainability Goal: Social Advanceme...

The Sustainability Goal: Social Advancement Checklist (Australia) mobile app is one part in the initial process of develop...

App Name

Sustainable Home Checklist: Windows, ...

Sustainable homes have three important elements: Environmental Sustainability, Social Sustainability / Universal Design an...

App Name

Sustainability Checklist for Engineer...

The Sustainability Checklist for Engineering Design (Australia) mobile app contains a helpful checklist of considerations ...

App Name

Water Management to Achieving Sustain...

The Water Management to Achieving Sustainability (Australia) mobile app is designed to help assist integrated water manage...

App Name

Sustainability Goal: Good Governance ...

The Sustainability Goal: Good Governance Checklist (Australia) mobile app is one piece in the preliminary process of const...