Medium

Available on

Apple Android Windows

Concrete Paving Quality Control Procedures: Air Content (Plastic Concrete, Pressure Method) Mobile App

Entrained air is essential to the long-term durability of concrete pavements that are subject to freezing and thawing. Air content is a commonly specified parameter in paving specifications. It is usually measured at the point of placement using a pressure meter (normally a type B meter). Although this test does not provide air system parameters, it is quick, easy to run, and has worked very well for years as a quality control tool. The Concrete Paving Quality Control Procedures: Air Content (Plastic Concrete, Pressure Method) mobile app covers: Purpose, Principle, Test Procedure, Test Method, Output and Construction Issues.

  • Lendlease
  • The Cooperative
  • PG&E
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Concrete Paving Quality Control Procedures: Air Content (Plastic Concrete, Pressure Method) Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico statictext

    Entrained air is essential to the long-term durability of concrete pavements that are subject to ...

  • Ico statictext

    The fresh concrete is fully consolidated in an airtight container.

  • Ico statictext

    The test is described in ASTM C 231.

  • Ico checkbox

    Consolidate the concrete in the measuring bowl using a tamping rod or vibrator and mallet.

  • Ico checkbox

    Strike off the concrete in the measuring bowl so that it is level with the top rim.

  • Ico checkbox

    Clean the edge and rim of the measuring bowl and clamp the cover on to form an airtight seal.

  • Ico checkbox

    Pump air into the air chamber until the gauge needle is stabilized on the initial pressure line.

  • Ico checkbox

    Open the valve between the air chamber and the measuring bowl.

  • Ico checkbox

    Tap the measuring bowl with the mallet to ensure that pressure is equalized.

  • Ico checkbox

    Tap the gauge lightly if necessary to stabilize the needle indicator.

  • Ico checkbox

    Record the percentage of air content indicated on the gauge.

  • Ico statictext

    Air content of the fresh concrete mixture is read directly from the gauge of a calibrated type B ...

  • Ico statictext

    This is a measure of the percentage of total air content in a concrete mixture.

  • Ico statictext

    The results are compared to the specifi ed limits and should be plotted on control charts for eas...

  • Ico statictext

    Air content should be monitored regularly during paving (minimum one test every 500 yd3).

  • Ico statictext

    Generally, air contents greater than 4.

  • Ico statictext

    High air contents are less worrisome than low air contents, unless the strength is reduced to cri...

  • Ico statictext

    Air content can be affected by many factors, ranging from cement and admixture chemistry to mixin...

  • ...and More!

Related Construction, Repair & Improvement Apps... and they're all free for GoCanvas subscribers!

App Name

Concrete Paving Quality Control Proce...

Mixture proportions must be adjusted for the moisture found in the aggregate stockpiles. Batching concrete based on inaccu...

App Name

NRMCA Guideline: Introduction

The NRMCA Guideline: Introduction mobile app provides an easy to follow checklist for the following areas: General Items, ...

App Name

Concrete Pavement Construction Basics...

The Concrete Pavement Construction Basics: Slip-form Paving Operations mobile app provides a helpful set of guidelines for...

App Name

Job Guide for Plant Mix Bituminous Pa...

The Job Guide for Plant Mix Bituminous Paving mobile app is intended to cover the very basic duties of inspection for Pla...

App Name

Concrete Paving Quality Control Proce...

The coffee cup test procedure can be used to monitor the uniformity of cementitious materials that are supplied on a pavin...

App Name

Cal Trans Asphalt Concrete Plant Insp...

The purpose of Cal Trans Asphalt Concrete Plant Inspection: Batch Plants Aggregate Weigh Hoppers mobile app is to act as a...

App Name

Caltrans Hot Mix Asphalt (QCQA): Qua...

The contractor should submit the quality control plan to the resident engineer with the submittal of the job mix formula s...

App Name

Job Guide for Base Course

The Job Guide for Base Course mobile app is intended to cover the very basic duties of inspection for Base Course. This ...

More Information