Medium

Available on

Apple Android Windows

Concrete Manual: Project Calibration of Concrete Mobile Mobile App

The Concrete Manual: Project Calibration of Concrete Mobile app procedure is applicable to mechanical and all-hydraulic Concrete Mobiles. It also applies to the Magnum Concrete Mobile with certain exceptions. Calibrations are based on 45 kg (100 lb.) quantities. These values are not exactly equal but these quantities are used for convenience. Exceptions are identified where they occur. Each Concrete Mobile Model has a unique number of revolutions and length of time to deliver 45 kg (100 lb.) of cement for state work.

  • Lendlease
  • The Cooperative
  • PG&E
  • oxy
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Concrete Manual: Project Calibration of Concrete Mobile Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico statictext

    This calibration procedure is applicable to mechanical and all-hydraulic Concrete Mobiles.

  • Ico statictext

    A.

  • Ico statictext

    The list of items required by the Contractor are:

  • Ico statictext

    A scale with a capacity of 225 kg (500 lb.

  • Ico statictext

    A box or other container to catch the discharged material on the scaleA box or other container to...

  • Ico statictext

    A suitable deflector (sheet metal, etc.

  • Ico statictext

    Project personnel verify the cement output.

  • Ico checkbox

    1. Check to see that the aggregate bins and the main conveyor belts are empty and clean

  • Ico checkbox

    Clean and free-up cement deposits from the cement meter feeder.

  • Ico checkbox

    Check the spring hammers and the cement meter register for proper operation.

  • Ico checkbox

    Check all bin vibrators for operation (two for cement bin, two for sand bin).

  • Ico checkbox

    Ensure that the cement bin aeration system is operating properly and that the air breather hole ...

  • Ico checkbox

    Ensure that the cement bin aeration system is operating properly and that the air breather hole ...

  • Ico checkbox

    Ensure the Concrete Mobile is properly grounded.

  • Ico checkbox

    Place the mix-conveyor in the travel position and fix the piece of sheet metal into the bottom e...

  • Ico checkbox

    With the cement meter register engaged, run out sufficient cement for charging the belt and ensu...

  • Ico checkbox

    Zero the meter, place the box or other container on the scale, and position so all the discharge...

  • Ico checkbox

    Engage the main conveyor and allow the equipment to run until the meter register reaches 45 kg (...

  • Ico checkbox

    Engage the main conveyor and allow the equipment to run until the meter register reaches 3 times...

  • Ico checkbox

    Stop the main conveyor.

  • Ico checkbox

    If the net mass (weight) does not fall between 135 and 138 kg (300 and 306 lb.

  • Ico statictext

    If the meter count does not fall within 135 and 138 kg (300 and 306 lb.

  • Ico statictext

    Example:

  • Ico statictext

    Original meter count = 70 revolutions

  • Ico statictext

    Original cement weight = 46 kg (102 lb.

  • Ico statictext

    Original time constant = 30 seconds

  • Ico statictext

    Average mass (weight) for 3 times the number of revolutions = 150 kg (331 lb.

  • ...and More!

Related Construction, Repair & Improvement Apps... and they're all free for GoCanvas subscribers!

App Name

Job Guide for Grading

The Job Guide for Grading mobile app is intended to cover the very basic duties of inspection for Grading. Discuss your r...

App Name

NRMCA Guideline: Human Resources

The NRMCA Guideline: Human Resources mobile app provides an easy to follow checklist for the following areas: General, Com...

App Name

Cal Trans Asphalt Concrete Plant Insp...

The purpose of Cal Trans Asphalt Concrete Plant Inspection: Continuous Mixing Plant Storage Bins and Cold Feed Systems mo...

App Name

Job Guide for Storm Sewer Installation

The Job Guide for Storm Sewer Installation mobile app is intended to cover the very basic duties of inspection for Storm S...

App Name

NRMCA Guideline: Measurement, Analysi...

The NRMCA Guideline: Measurement, Analysis and Improvement mobile app provides an easy to follow checklist for the followi...

App Name

Cal Trans Asphalt Concrete Plant Insp...

The purpose of Cal Trans Asphalt Concrete Plant Inspection: Continuous Mixing Plant Weighbelts mobile app is to act as a ...

App Name

Thin Hot-Mix Asphalt Overlay Checklis...

The Thin Hot-Mix Asphalt Overlay Checklist: Preliminary Responsibilities mobile app was created to guide State and local h...

App Name

NRMCA Guideline: Sample Mix Design Re...

Concrete mix design can entail water-cement ratios, workability, compressive strength and other information about the ceme...

More Information