Concrete Manual: Project Calibration of Concrete Mobile Mobile App

The Concrete Manual: Project Calibration of Concrete Mobile app procedure is applicable to mechanical and all-hydraulic Concrete Mobiles. It also applies to the Magnum Concrete Mobile with certain exceptions. Calibrations are based on 45 kg (100 lb.) quantities. These values are not exactly equal but these quantities are used for convenience. Exceptions are identified where they occur. Each Concrete Mobile Model has a unique number of revolutions and length of time to deliver 45 kg (100 lb.) of cement for state work.

  • Lendlease
  • The Cooperative
  • PG&E
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Concrete Manual: Project Calibration of Concrete Mobile Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico statictext

    This calibration procedure is applicable to mechanical and all-hydraulic Concrete Mobiles.

  • Ico statictext

    A.

  • Ico statictext

    The list of items required by the Contractor are:

  • Ico statictext

    A scale with a capacity of 225 kg (500 lb.

  • Ico statictext

    A box or other container to catch the discharged material on the scaleA box or other container to...

  • Ico statictext

    A suitable deflector (sheet metal, etc.

  • Ico statictext

    Project personnel verify the cement output.

  • Ico checkbox

    1. Check to see that the aggregate bins and the main conveyor belts are empty and clean

  • Ico checkbox

    Clean and free-up cement deposits from the cement meter feeder.

  • Ico checkbox

    Check the spring hammers and the cement meter register for proper operation.

  • Ico checkbox

    Check all bin vibrators for operation (two for cement bin, two for sand bin).

  • Ico checkbox

    Ensure that the cement bin aeration system is operating properly and that the air breather hole ...

  • Ico checkbox

    Ensure that the cement bin aeration system is operating properly and that the air breather hole ...

  • Ico checkbox

    Ensure the Concrete Mobile is properly grounded.

  • Ico checkbox

    Place the mix-conveyor in the travel position and fix the piece of sheet metal into the bottom e...

  • Ico checkbox

    With the cement meter register engaged, run out sufficient cement for charging the belt and ensu...

  • Ico checkbox

    Zero the meter, place the box or other container on the scale, and position so all the discharge...

  • Ico checkbox

    Engage the main conveyor and allow the equipment to run until the meter register reaches 45 kg (...

  • Ico checkbox

    Engage the main conveyor and allow the equipment to run until the meter register reaches 3 times...

  • Ico checkbox

    Stop the main conveyor.

  • Ico checkbox

    If the net mass (weight) does not fall between 135 and 138 kg (300 and 306 lb.

  • Ico statictext

    If the meter count does not fall within 135 and 138 kg (300 and 306 lb.

  • Ico statictext

    Example:

  • Ico statictext

    Original meter count = 70 revolutions

  • Ico statictext

    Original cement weight = 46 kg (102 lb.

  • Ico statictext

    Original time constant = 30 seconds

  • Ico statictext

    Average mass (weight) for 3 times the number of revolutions = 150 kg (331 lb.

  • ...and More!

Related Construction, Repair & Improvement Apps... and they're all free for GoCanvas subscribers!

App Name

Concrete Structures Inspection: Headw...

The Concrete Structures Inspection: Headwalls and Retaining Walls mobile app summarizes some of the key differences among ...

App Name

Concrete Pavement Rehabilitation: Cra...

The Concrete Pavement Rehabilitation: Crack Repair Type SA-A3 mobile app has been designed to be used as a specification c...

App Name

Reinforced Concrete Field Checklist

The Reinforced Concrete Field Checklist mobile app provides a detailed field checklist that covers important details such ...

App Name

NRMCA Guideline: Checklist for Orderi...

The intent of the NRMCA Guideline: Checklist for Ordering and Scheduling Ready Mixed Concrete, NRMCA and ASCC mobile app i...

App Name

Concrete Pavement Rehabilitation: Uti...

The Concrete Pavement Rehabilitation: Utility Trench Full Depth Repair Type SA-C2 mobile app has been designed to be used ...

App Name

NRMCA Guideline: Facilities, Plant(s)...

The NRMCA Guideline: Facilities, Plant(s) and Equipment mobile app provides an easy to follow checklist for the following ...

App Name

Concrete Pavement Rehabilitation: Par...

The Concrete Pavement Rehabilitation: Partial Depth Repair Type SA-BA mobile app has been designed to be used as specifica...

App Name

Ready Mix Concrete Plant Certificatio...

The Ready Mix Concrete Plant Certification Procedures mobile app outlines the process of preparing for ready mix concrete ...

More Information