Generator Pre Start-Up Checklist Mobile App

The Generator Pre Start-Up Checklist mobile app helps ensure that all necessary generator pre-start tasks are completed before a service technician shows up at your job site for an occupancy inspection. The app, designed for use with gas generators, standby generators and motor generators, includes a full startup checklist that can be customized to fit your needs. Use the app to make sure that generators run correctly in order to protect the health and safety of building occupants in case of power outages. When used as part of your regular startup management routine, you can ensure that your generator set is ready to be inspected for use.

When performing a generator pre-start process, it's important to perform tests of the combustion chamber, control panel, ignition switch, ground fault and other features a full seven days before your inspection is scheduled. This ensure that you have enough time to get through each item on the startup checklist and make adjustments as needed. The app is perfect for construction managers, electric generator and gas generator service companies and others who need a reliable way to complete generator set tests.

  • Lendlease
  • The Cooperative
  • PG&E
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Generator Pre Start-Up Checklist Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico statictext

    For Generator and/or Automatic Transfer Swit

  • Ico checkbox

    Fuel supply system hooked up using supplied flex fuel lines.

  • Ico textbox

    NG

  • Ico textbox

    LPV

  • Ico textbox

    LPL

  • Ico textbox

    D

  • Ico checkbox

    Fuel supply available

  • Ico checkbox

    Gallons of diesel fuel has been installed in the sub-base tank, or above ground tank.

  • Ico statictext

    **If unit is natural gas or propane, please ensure the mechanical contractor has completed the fo...

  • Ico checkbox

    Primary regulator has been installed.

  • Ico decimal

    BTU rating of primary regulator is (btu’s)

  • Ico decimal

    Size of pipe used between primary regulator and generator is (inches)

  • Ico decimal

    Primary regulator is adjusted to (inches) of water column

  • Ico statictext

    **It is the contractors responsibility to properly size the piping and regulators

  • Ico checkbox

    Was a load bank test purchased with your generator?

  • Ico decimal

    If yes, How many hours:

  • Ico decimal

    How close can the technician park to the generator?

  • Ico statictext

    Control Wiring: Must be in separate Conduit from AC wires.

  • Ico checkbox

    Control wires are in separate conduit from power wires

  • Ico checkbox

    If a H type transfer switch is used, a 2 conductor twisted, shielded cable has been installed

  • Ico statictext

    AC Leads:

  • Ico checkbox

    Separate from control wiring.

  • Ico checkbox

    Terminated correctly

  • Ico checkbox

    Wiring positioned neatly in control panel and ATS.

  • Ico statictext

    Remote Annunciator:

  • Ico checkbox

    Has been installed.

  • Ico checkbox

    wire Twisted, Shielded Cable has been run between generator and remote annunciator.

  • Ico statictext

    24 AWG UP TO 250 FEET.

  • ...and More!

Related Construction, Repair & Improvement Apps... and they're all free for GoCanvas subscribers!

App Name

Subterranean Termite Protection Build...

The Subterranean Termite Protection Builder's Guarantee Mobile App is for use by construction contractors and builders to...

App Name

Guidelines for Exterior Maintenance: ...

Almost all buildings include some masonry, in some cases as a wall material, but typically as a foundation, pier or chim...

App Name

NRMCA Guideline: Sample Report Of Pla...

The NRMCA Guideline: Sample Report Of Plant And Truck Inspection mobile app inspection records Calibration, Maintenance To...

App Name

Caltrans Hot Mix Asphalt (QCQA): Qua...

The Caltrans Hot Mix Asphalt (QCQA): Quality Control Plan Review Checklist for Hot Mix Asphalt is designed to allow both ...

App Name

Concrete Paving Quality Control Proce...

Freeze-thaw resistance of concrete is primarily controlled by an air-void system with closely spaced small bubbles. The ai...

App Name

Army FAAST Checklist: Project Managem...

This Army FAAST Checklist: Project Management/ Facility Assessment Mobile App allows you to examine and assess your facili...

App Name

Hydraulic Excavator Operator: Verify ...

The Hydraulic Excavator Operator: Verify Zero Energy State Mobile App is designed to verify zero energy state, by lowering...