Medium

Available on

Apple Android Windows

High Pressure Boilers Pre-Inspection Checklist Mobile App

The High Pressure Boilers Pre- Inspection Checklist takes you through compliance issues that must be met prior to passing inspection. Checklist which reflects the most common violations found by Field Inspectors. This checklist is designed to be generic in content and may not include all requirements for your particular installation. It can easily be customized to meet specific requirements, for city, county and state. The manufacturer’s installation instruction must be adhered to and available to the inspector at the time of the inspection. Be sure you can answer YES to all of the questions before calling for inspection. Failure of the inspection could require a re-inspection fee to be paid.

  • Lendlease
  • The Cooperative
  • PG&E
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the High Pressure Boilers Pre-Inspection Checklist Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico statictext

    Notice: This checklist reflects the most common violations our field inspectors encounter when pe...

  • Ico statictext

    Administration and General Requirements

  • Ico checkbox

    Contractors must be registered with the Department of Labor and Industries before installing/rein...

  • Ico checkbox

    Once the installation/reinstallation is complete the owner or user shall not operate the boiler u...

  • Ico checkbox

    A Boiler/Pressure Vessel Installation or Reinstallation Permit form must be submitted to the Boil...

  • Ico checkbox

    The minimum clearance for low pressure steam boilers is determined by the BTU input.

  • Ico checkbox

    All high-pressure boilers shall be constructed, stamped, and installed in accordance with ASME Se...

  • Ico checkbox

    All boilers installed or refitted after December 1998, shall be equipped with suitable primary sa...

  • Ico checkbox

    A manually operated remote shutdown switch or circuit breaker should be located outside the boile...

  • Ico checkbox

    The owner/user is responsible for fees.

  • Ico checkbox

    Boilers with an MAWP of 400 psi or less require at least one gage glass.

  • Ico checkbox

    Boilers with an MAWP over 400 psi require at least two gage glasses.

  • Ico checkbox

    The lowest visible part of the water gage glass shall be at least 2 in.

  • Ico checkbox

    Tubular or transparent gages that rely on observing the steam-water interface and consist of mult...

  • Ico checkbox

    Each water gage glass shall be fitted with a drain cock or valve having an unrestricted drain ope...

  • Ico checkbox

    When the boiler operating pressure exceeds 100 psi the glass shall be furnished with a connection...

  • Ico checkbox

    Each water gage glass shall be equipped with a top and bottom shutoff valve of such through-flow ...

  • Ico checkbox

    Straight-run globe valves shall not be used on such connections.

  • Ico checkbox

    The pressure–temperature rating of such valves shall be at least equal to that of the lowest set ...

  • Ico checkbox

    The water column shall be so mounted that it will maintain its correct position relative to the n...

  • Ico checkbox

    The water column shall be fitted with a connection for a drain cock or drain valve to install a p...

  • Ico checkbox

    Connections from the boiler to the water column shall be at least NPS 1.

  • Ico checkbox

    For pressures of 400 psi or more, lower connections to drums for water columns and remote level i...

  • Ico checkbox

    The steam and water connections to a water column or a water gage glass shall be such that they a...

  • Ico checkbox

    Shutoff valves shall not be used in the pipe connections between a boiler and a water column or b...

  • Ico checkbox

    Gage cocks are not required.

  • Ico checkbox

    Each boiler shall have a pressure gage so located that it can be easily read.

  • Ico checkbox

    A valve or cock shall be placed in the gage connection adjacent to the gage.

  • ...and More!

Related Construction, Repair & Improvement Apps... and they're all free for GoCanvas subscribers!

App Name

Low Pressure Steam Boiler Pre-Inspect...

The Low Pressure Steam Boiler Pre-Inspection Checklist mobile app provides a simple inspection for low pressure vessels an...

App Name

Air Conditioner/ Heat Pump Pre-Inspec...

Looking for an air conditioner/heat pump pre-inspection checklist for your team members to reference while they work? The ...

App Name

Potable Hot Water Boilers Pre-Inspect...

The Potable Hot Water Boilers Pre-Inspection Checklist takes you through compliance issues that must be met prior to passi...

App Name

Potable Water Heaters Pre-Inspection ...

The Potable Water Heaters Pre-Inspection Checklist takes you through compliance issues that must be met prior to passing i...

App Name

Underground Plumbing Inspection Check...

The Underground Plumbing Inspection Checklist mobile app makes it easy to perform underground plumbing inspections using a...

App Name

Alteration Polybutylene Re-Pipe Inspe...

The Alteration Polybutylene Re- Pipe Inspection Checklist takes you through compliance issues that must be met prior to pa...

App Name

Electric/Gas Conversion Pre-Inspectio...

The Electric/Gas Conversion Pre-Inspection Checklist takes you through compliance issues that must be met prior to passing...

App Name

Commercial Punch List

The Commercial Punch List app is intended for property owners of commercial retail estate who don't want to spend money on...

More Information


Related Blog Posts