Guide Tunnelling (Australia): Specific Hazards, Risks and Control Measures – Working with Compressed Mobile App

Tunnelling work often uses plant with compressed air systems. These include air compressors and receivers known as pressure vessels that may be stand-alone or be contained within the compressor unit, water traps, reticulation components and valves and hoses supplying compressed air powered tools and equipment. These systems create risks during installation and use. The Guide Tunnelling (Australia): Specific Hazards, Risks and Control Measures – Working with Compressed Air mobile app includes specific hazards, risks and control measures for working with compressed air. This app is part of a collection of Guide Tunnelling (Australia) apps. Download them all for free!

  • Lendlease
  • The Cooperative
  • PG&E
  • oxy
  • Red Bull
  • Mirvac

Want to learn more about GoCanvas?

Request a Demo

Take a peek inside the Guide Tunnelling (Australia): Specific Hazards, Risks and Control Measures – Working with Compressed Mobile App

Included Features

Our App Builder gives you the power to easily add and remove the ones you want. {{controller.show_all ? 'See included features.' : 'See more features.'}}

  • {{data.title}}

Included Fields

Customize to add, remove, or edit any of the fields below.

  • Ico date

    Date of Inspection

  • Ico textbox

    Location

  • Ico gps

    GPS

  • Ico textbox

    Contractor Name

  • Ico textbox

    Contract Number

  • Ico textbox

    Project Name

  • Ico textbox

    Contract Number

  • Ico textbox

    Project Name

  • Ico textbox

    Inspector Name

  • Ico signature

    Inspector Signature

  • Ico textbox

    Engineer's Name

  • Ico signature

    Engineer's Signature

  • Ico checkbox

    sudden release of pressure due to a failure with pressure

  • Ico checkbox

    vessels or pipes, flexible hoses and tools

  • Ico checkbox

    incorrect installation of pipes, inadequate pressure rating and stressed joints

  • Ico checkbox

    incorrect work methods e.

  • Ico checkbox

    pressure not bled before working on reticulation

  • Ico checkbox

    checks not made before pressurisation

  • Ico checkbox

    uncoupling hoses under pressure

  • Ico checkbox

    not fitting clips or chains

  • Ico checkbox

    unsafe acts like cleaning with compressed air with unsuitable or no PPE

  • Ico checkbox

    absence of or unsuitable PPE

  • Ico checkbox

    breakdown products of oils in compressed breathing air including carbon monoxide

  • Ico statictext

    ensuring:

  • Ico checkbox

    compressed airlines have relevant colour coding or signage

  • Ico checkbox

    traffic has clearance around plant including valves

  • Ico checkbox

    installing labelled isolation valves 200 m apart and at intersections

  • Ico checkbox

    supporting pipes at each end before a joiner and to the wall or roof

  • ...and More!

Related Mining, Quarrying, Oil, Gas & Chemicals Apps... and they're all free for GoCanvas subscribers!

App Name

Geotechnical Report: GTR Review Check...

The Geotechnical Report: GTR Review Checklist for Landslide Corrections mobile app covers the basic information and recomm...

App Name

Geotechnical Report: GTR Review Check...

The Geotechnical Report: GTR Review Checklist for Improvement Techniques mobile app covers the basic information and recom...

App Name

Guide Tunnelling (Australia): Emergen...

All types of emergency and rescue scenarios should be considered when developing emergency procedures. Information from a ...

App Name

Straight Line Directional Drilling Sy...

This Straight Line Directional Drilling System: Pullback Checklist Mobile App is used before starting the process, in orde...

App Name

Guide Tunnelling (Australia): Specifi...

The ground conditions should be inspected in line with the inspection plan as the excavation progresses. The results shoul...

App Name

Guide Tunnelling (Australia): Specifi...

Control measures should be implemented to eliminate or minimise, so far as is reasonably practicable, the risks associated...

App Name

Well Boring: Levee Borings QC Checklist

The Well Boring: Levee Borings QC Checklist mobile app has been developed safety practices for drilling, sampling, samples...

App Name

Pre Drilling Assessment

The Pre Drilling Assessment mobile app should be completed least 2 days prior to drilling. Any recognized safety related c...

More Information


Related Blog Posts